跳到正文
Lisan al Gaib· @scaling01 · X·· 22 小时前AI 评分60
AI 导读

马斯克称 SpaceX 在 2026 年剩余时间每月上线约 20 万块 NVIDIA GB300 GPU,明年部署节奏相近,主要转向 Vera Rubin。被引内容还提到公司预计 2026 年底上线 2.5-3 GW 算力,2027 年可能再增 10 GW,并计划在 2027 年 Q2 末投运 44 万块 GPU 的 Vera Rubin 训练集群。

正文 · 原文

"Musk says SpaceX is on track to bring roughly 200,000 NVDA GB300 GPUs online per month for the remainder of 2026"

That is insane. Hopefully most of this goes to Anthropic :P

引用Wall St Engine@wallstengine
ELON MUSK TARGETS 13 GW OF AI COMPUTE BY 2027, WITH 440,000 NVIDIA VERA RUBIN GPUS IN A SINGLE TRAINING CLUSTER Musk says SpaceX is on track to bring roughly 200,000 $NVDA GB300 GPUs online per month for the remainder of 2026, with deployments continuing at a similar pace next year, primarily using Vera Rubin. The company expects to have 2.5-3 GW of compute online by the end of 2026, with another 10 GW potentially coming online in 2027. Musk also plans to have a 440,000-GPU Vera Rubin training cluster operational by the end of Q2 2027. To support the expansion, SpaceX is targeting an additional 20 GW of power and cooling infrastructure next year. Musk said there is a “non-zero possibility” of exceeding 20 GW of operational AI compute in 2027, although he acknowledged the probability remains small.
在 X 查看被引用的帖子

来源:Lisan al Gaib · x.com